VIEW OUR RECENTLY COMPLETED SURVEYING PROJECTS

PROJECTS

Scope Surveying Pty Ltd is based in Maitland and predominantly services the Hunter Valley and surrounds in all areas of surveying. Since commencing operations in 2004, Scope has been involved in significant engineering, cadastral and mining projects. In addition to land surveying, Scope also has extensive experience in high-definition scanning, aerial and hydrographic surveys.


Construction Projects of Note


2022 Flood Erosion Topographic Surveys


Yango Creek



Hunter River



City Road Upgrade, Adamstown Heights (Aug 2021 – Dec 2022)

  • TfNSW Project
  • Preservation of Survey Infrastructure (POSI)
  • Construction surveyors



Rock Bag Seawall, Stockton Beach (Dec 2020 – Sept 2021)

  • Full-time construction surveyor for Soil Conservation Service
  • Design assistance
  • UAV pilot for regular progress images and volume calculations



Honeysuckle Drive Realignment (Feb 2020 - Mar 2021)

  • Primary construction surveyors
  • Design amendments
  • Underground services’ capture and data handling




Newcastle Bus Interchange (2019 - 2020)

  • Primary construction surveyors
  • Design amendments




Newcastle Light Rail (2017 – 2018)

  • Primary construction surveyors for Robson Civil Projects - 9 full-time surveyors
  • All construction set out, major design corrections and QA




Cessnock Correctional Facility – Stages 1 & 3 (2016-2017 & 2018-2019)

  • Primary construction surveyors for Robson Civil Projects - 2 full-time surveyors
  • Other clients: Lend Lease, Cumnock Constructions Sustainability Pty Ltd
  • All construction set out, major design QA and rectification




Glencore Bulga Optimisation Project (2011 – 2015)

Clients and primary tasks:

  • Glencore (detail surveys, bridge deformation monitoring networks)
  • Robson Civil Projects (2 full-time surveyors - road and bridge constructions, earthworks set out, design, claims, WAE)
  • Keller Civil Engineers (earthworks set out, design, claims, WAE)
  • Downer Engineering Power (330kV easement and towers’ setout)
  • Yore Contractors (pipeline set out and WAE)




BHP Mount Arthur Coal – RX1 (2011 – 2013)

Clients and primary tasks:

  • BHP (scanning, detail surveys, services set out and WAE, design)
  • Keller Civil Engineers (earthworks set out, design, claims, WAE)
  • St Hilliers, HF Hand, Fleet Wash, RTC Commercial, Moore Management (civil and mechanical engineering surveying)



Xstrata Ravensworth North (2011 – 2013)

Clients and primary tasks:

  • Downer EDI Engineering (6 full-time surveyors, primary construction survey company)
  • Robson Civil Projects (3 full-time surveyors - earthworks set out, design, claims, WAE)
  • Xstrata Cumnock (design QA and revisions - 1 full-time surveyor, detail surveys, rail set out)
  • Keller Civil Engineers (earthworks set out, design, claims, WAE)
  • Farrelly Construction Services, Milleen Constructions, Shearer Contracting (civil and mechanical engineering surveying)
  • Downer EDI Engineering Power (new services set out and WAE)
  • Wagstaff Piling (infrastructure foundation set out)
  • Yore Contractors (Pipeline set out and WAE)




Xstrata Mangoola Mine Infrastructure (2008 – 2011)

  • Xstrata Mangoola (4 surveyors, primary construction survey company - various detail, set out and cadastral surveys, road design)
  • Shearer Contracting, Keller Civil Engineers, Robson Civil Projects (earthworks set out, design, claims, WAE)
  • Downer EDI Engineering (quality assurance surveys, services set out and WAE)
  • Frankipile Australia (Infrastructure foundation set out)
  • Yore Contractors (Pipeline and pile set out)
  • Thomas & Coffey, Robson Civil Projects, Moore Consulting, Shannon Civil, KTB Mining and Construction (Infrastructure set out, deformation monitoring and WAE)




Coal and Allied Bengalla Mine ROM Relocation Project (2008 – 2010)

  • Bengalla Mining Company, Gleeson Civil Engineering, Robson Civil Projects (detail surveys, earthworks set out and design, claims, WAE)
  • Sedgman Limited (infrastructure set out, WAE)




Downer EDI Engineering Power – Kooragang Island (2008-2012)


Robson Civil Projects various civil construction projects additional to those listed above (since 2005)


Keller Civil Engineers various civil construction projects additional to those listed above (since 2008)


Stevens Construction various residential facility construction projects since 2016


Soil Conservation Service various survey, design and drafting services since 2020


Annual CHPP and coal loadout system structural deformation monitoring for Wambo Coal Pty Ltd since 2009


Donaldson Coal - Tasman and Abel Mines’ Infrastructure, primary construction surveyors (2006 – 2010)



Calsun Materials Handling & Shearer Contracting - Liddell Mine & CHPP Infrastructure (2007- 2009)


United Group Limited - Bayswater Power Station 500kV Sub-station Construction and Transformer Replacement (2008-2010)


Kinmont Engineers - Wambo Module 3 Coal Handling Preparation Plant, 2 full-time surveyors (2006-2007)



Kinmont Engineers - Wambo Clean Coal Handling Facility, 1 full-time surveyor (2005-2006)

 



Waycon Services - Bayswater Power Station Water Treatment Plants (2007)



Barclay Mowlem - Delta Link Coal Clearance System (2005)



Professional Associations

 

The Company and its staff are currently members of the following professional associations:

  • Association of Consulting Surveyors NSW
  • Institution of Surveyors NSW


Need more information? Contact our friendly team today on 02 4934 2868 to discuss your surveying requirements.

Share by: